What to Know About Cathodic Protection in Nebraska
Nebraska lets only Fire Marshal certified testers run cathodic protection tests on regulated tanks. Tank operation and corrosion protection sit with the Fuels Division, which runs the State Fire Marshal UST program under Title 159 NAC. Testers read whether sacrificial anodes or an impressed current rectifier still protect buried steel, and the FLST 7530 notification form records which type each tank uses. Leak cleanup belongs to DWEE, which Neb. Rev. Stat. 81-15,118 names as the agency with primary responsibility for the storage act. Buyers planning an environmental review before a Nebraska purchase can ask for the corrosion protection records the Fire Marshal reviews each year.
State Fire Marshal staff inspect every tank at least yearly under 159 NAC chapter 12. Those visits include corrosion protection records, and Neb. Rev. Stat. 81-15,123 bars any fee for them. Metallic product lines must carry CP under 159 NAC chapter 4, though vent and fill lines need only a coating. The Fire Marshal posts a list of currently certified CP testers, worth checking before you call cathodic protection companies in Nebraska listed in the Nebraska tank contractor directory. Installation and closure contractors need a separate Fire Marshal license backed by at least $500,000 of general liability insurance.
Owners pay the State Fire Marshal $90 per registered tank each year for the Petroleum Release Remedial Action Fund, a fee set by Neb. Rev. Stat. 66-1520. Reimbursement from that fund requires that the tank was in substantial compliance, per Neb. Rev. Stat. 66-1525. Registration invoices go out in November and December, with payment due January 1. Rectifier sites budget for a CP test every year here, against one every three years for sacrificial anode sites, so system type shapes the long-run bill. Bids also scale with tank count and test stations, so ask how retests are billed when you collect Nebraska CP quotes.
159 NAC chapter 6 adopts the federal CP operation rule, section 280.31 of 40 CFR, by reference. It then moves impressed current systems to a yearly test, while sacrificial anode systems keep the three-year cycle. Every new system, factory anodes included, still needs its first test within six months of going in. If a leak surfaces at an Omaha or Kearney site, crews digging there should show hazardous waste operations and emergency response training records. Schedule the next round of cathodic protection testing in Nebraska from the date on your last report, not from the Fire Marshal's yearly visit.
Frequently Asked Questions
How does a tester earn Nebraska Fire Marshal CP certification?
The Fire Marshal's tester application form asks for a course completion certificate or a NACE certification card. Applicants must also meet the tester definition in 40 CFR 280.12, adopted in 159 NAC chapter 1. A written exam on state UST rules follows. A score of 80 percent passes. The form lists exams in Lincoln on the second Friday of each month, and certification lasts three years before the exam is due again.
How much of a corrosion-related cleanup does Nebraska's fund leave to the owner?
DWEE's fund page puts most owners at up to $25,000 per release: a $10,000 deductible plus 25 percent of the next $60,000. Low-volume applicants carry less. Their deductible is $5,000 plus 25 percent of the next $40,000. Reimbursement stops at $975,000 per occurrence, or $985,000 for low-volume applicants, under section 66-1523. Section 66-1525 lets a claim shrink by up to 100 percent for ignored requirements such as scheduled CP testing.
How long do Nebraska owners have to claim fund money after a corrosion leak?
Only releases reported on or before June 30, 2028 qualify, under Neb. Rev. Stat. 66-1523. After DWEE approves a remedial phase, a complete fund application is due within one year of the compliance date it sets. The Fire Marshal reviews each application before DWEE considers it. Tightness and leak checks are listed separately under Nebraska tank testing services.
Can the State Fire Marshal red-tag a Nebraska fill pipe for corrosion protection violations?
Yes, and fuel deliveries stop when it happens. 159 NAC chapter 11 lists corrosion protection requirements under chapter 4 and recordkeeping requirements under chapters 5, 6 and 7 among the triggers for delivery prohibition. Under that order, the State Fire Marshal fixes a red tag to the fill pipe of each noncompliant tank. Neb. Rev. Stat. 81-15,125 also allows a civil fine of up to $5,000 per offense, and every day a violation continues counts as another offense.
What should a Nebraska owner do after a CP test fails?
Expect the State Fire Marshal to hear first: Title 159, chapter 3 has the tester report each failed test within 24 hours or the next business day. Owners have their own 24-hour duty under chapter 6 for failed release prevention and release detection tests, though its examples do not name CP tests. The yearly Fire Marshal inspection then reviews corrosion protection records, so keep the failed report and the repair records together. Read steps after a failed CP test before approving any anode or rectifier work.