What to Know About Cathodic Protection in North Carolina
North Carolina cathodic protection contractors record every survey on one of two NCDEQ forms. The UST Section enforces 15A NCAC 02N .0402, which adopts 40 CFR 280.31: a CP test within 6 months of installation, then at least every 3 years. Owners send results within 30 days: form UST-7A covers sacrificial anode systems, and UST-7B covers the impressed current designs that run on a rectifier. On a galvanic site, UST-7A has the tester read each tank and pipe run directly over it with a copper/copper sulfate electrode. The form then wants two remote readings 25 to 100 feet away that agree within 10 mV.
At fuel stops on I-85 and I-40 through Charlotte, Greensboro and Raleigh, North Carolina UST contractors often take readings over tanks buried under drive lanes that never close. One North Carolina request sent here this year described a three-tank station whose rectifier and continuity still worked but whose anodes were mostly spent. The scope called for mixed metal oxide anodes set in drilled wells with coke breeze backfill, then spliced into the old header cables. Because supplemental anodes change an impressed current system, UST-7B calls for a corrosion expert's design and a re-survey once the system reaches steady-state polarization.
Under G.S. 143-215.94B, the Commercial Leaking UST Fund pays eligible cleanup costs above $20,000 per occurrence when the tank met performance standards before the release. It pays up to $1,000,000, then 80 percent of costs beyond that up to $1,500,000. A commercial tank that missed those standards gets 60 percent of costs between $20,000 and $157,500, then 100 percent above that. Those standards are the ones for tanks installed after 22 December 1988 or upgraded by 22 December 1998, and for steel with CP they include corrosion protection kept in working order. UST-7A and UST-7B require soil access directly over every protected structure and a site drawing coding each electrode spot, so paved lots and long piping runs take longer to survey. Before accepting a bid that answers a quote request, check that it prices that drawing, which must show tanks, piping, dispensers, anodes and test stations.
Pull the last two UST-7A or UST-7B reports before the visit, plus any UST-21 rectifier log, whose columns record tap settings, DC volts and amps and the hour meter. On impressed current, UST-7B wants on and instant-off readings from at least three local spots over each structure, set away from active anodes. If the tester plans to turn the rectifier up or down, ask who will sign off, because NCDEQ's UST-7B requires a corrosion expert's evaluation of any output adjustment. Drilling anode wells at an older station can bring up fuel-stained soil, so ask whether that crew has finished a HAZWOPER course. Calendar the 30-day filing date on survey day.