What to Know About Cathodic Protection in Kansas

Kansas puts a license requirement on everyone who tests cathodic protection. KDHE oversees UST corrosion work, and K.A.R. 28-44-22 bars any individual from testing a UST system without a Kansas tester license, while K.A.R. 28-44-20 adds a Kansas UST contractor license for anyone installing, removing or testing. In practice, the licensed tester uses a meter to prove whether a steel tank's corrosion protection, from sacrificial anode packs or a powered rectifier, is still working. A Phase I property review that turns up an old release on a Kansas site is also the point to ask whether the state release trust fund applies.

Metro sites sit right beside Missouri. A tester based across the line still needs Kansas licenses under K.A.R. 28-44-20 and K.A.R. 28-44-22 to work here. Out on the Great Plains, the nearest licensed tester may be an hour or more from a cooperative's lone steel tank, which makes the thirty-day rectifier rule harder to cover with outside help. Each firm on the Kansas UST contractors page can be checked against KDHE's own license list before the visit.

On an impressed current site, the thirty-day rectifier check in K.A.R. 28-44-19 is a year-round task, whether staff or a contractor handles it. Tanks and piping runs set the base for the survey itself, test stations add readings, and a paved Kansas City lot may need coring before a reference cell reaches soil. Once a CP survey fails, the repair becomes the biggest unknown, since the fix might be a handful of fresh anodes or a rebuilt rectifier circuit. A leak found along the way may qualify for the underground petroleum storage tank release trust fund, which the secretary of health and environment administers for releases rather than testing. Send the tank count and system type when you request CP pricing.

A rectifier can keep humming in its cabinet long after the anodes it feeds are spent, and in that case fresh anodes can restore protection without replacing the whole system. Normal output proves little on its own. Lawrence and Olathe testers check that output, hunt for stray current, then take a structure-to-soil reading on every tank, piping run and metal connector. Digging a new anode bed beside an old Great Plains bulk plant can mean working in fuel-stained ground, a job for a crew with hazardous waste operations training. Clear parked trucks and stored pallets off the test station covers ahead of the visit, because a lid hidden under a Wichita delivery trailer can cost a second trip.

Kansas contractors for cathodic protection

See all Kansas contractors

Frequently Asked Questions

Does Kansas license the people who test CP?

Yes, Kansas licenses both the business and the person. K.A.R. 28-44-20 requires a Kansas UST contractor license for anyone installing, removing or testing, and K.A.R. 28-44-22 adds an individual tester license for the person who runs the test. KDHE's tester report shows CP as its own specialty, so check that the named tester holds it. Federal law, in 40 CFR 280.12, also expects a tester to know soil resistivity, stray current and isolation measurements. Design is separate. Under 40 CFR 280.20, a field-installed system on a steel tank needs a corrosion expert's design.

What adds cost to a CP job in Kansas?

A failed survey is the main swing. Under 40 CFR 280.33, which K.A.R. 28-44-19 adopts, another CP test must follow within six months of any repair, so new anodes at a Wichita station put a second CP survey on the calendar. That retest needs a licensed tester too, under K.A.R. 28-44-22, just like the first survey. Where the rectifier and wiring still test sound, pricing new anodes alone can keep the repair smaller.

How often must a Kansas impressed current system be checked?

Every thirty days, twice as often as the federal rule asks. K.A.R. 28-44-19 adopts 40 CFR 280.31 but replaces the federal sixty-day rectifier inspection with a thirty-day one. A Topeka operator whose corrosion monitoring includes a rectifier reading every four weeks stays inside the window. Kansas also strikes the clause that lets an agency pick another schedule, so the first CP testing falls within six months after installation, then every three years. Tightness testing follows the separate release detection rules adopted in K.A.R. 28-44-23, the work covered on the Kansas tank testing contractors page.

Why does KDHE want a copy of every Kansas CP test?

Under K.A.R. 28-44-22, a tester's license can be denied, suspended or revoked for failing to send KDHE a copy of each UST test on a regulated Kansas tank. The duty sits with the tester, so KDHE ends up with its own copy of each test. Owners still keep their own file, since 40 CFR 280.31 calls for results from the last two CP tests. Ask the tester to note when the copy went to KDHE.

What happens during a CP test at a Kansas fuel site?

Because K.A.R. 28-44-19 adopts 40 CFR 280.31, a Kansas test is judged against the codes that rule names, including NACE TM0101, NACE TM0497 and Steel Tank Institute R051. R051 is the one written for STI-P3 tanks, the factory-built steel tanks that arrive with anodes already attached. A Great Plains cooperative with one such tank and a Kansas City truck stop running impressed current can be judged under different codes, so the report should say which one was used. A failing result goes to KDHE like any other test, and the CP testing guide covers the repair steps that follow.