What to Know About Cathodic Protection in Washington

Cathodic protection, the anodes or impressed current that keep buried steel from rusting, answers to state law, not federal law, on regulated Washington tanks. Ecology's underground storage tank program enforces chapter 173-360A WAC, and only a certified service provider, or someone it directly supervises, may test. Under WAC 173-360A-0930, the Department of Ecology accepts tester certification from the International Code Council's U4 exam, NACE, the Steel Tank Institute, or another body it approves. A tester who installs a system, or makes a repair a corrosion expert specified, needs the ICC credential in particular under the WAC 173-360A-0920 table. When a Phase I review on a Washington property finds a steel tank with no CP, ask for the corrosion expert report that rule 0310 requires to excuse it.

Every regulated Washington site carries a facility compliance tag, and RCW 70A.355.020 ties that tag to corrosion protection compliance. Ecology also inspects tank systems at least every three years, so a lapsed CP test in Tacoma or Spokane tends to surface at the next visit. Homeowners sit outside all of this, because Ecology does not regulate home heating oil tanks and refers those owners to the Pollution Liability Insurance Agency. Commercial owners can compare cathodic protection companies in Washington through the Washington UST contractor listings and then confirm each tester's ICC, NACE or STI number.

Washington's annual state UST fee rose to $258.80 per tank on July 1, 2026, according to Ecology's 2026 tank fee notice. PLIA's UST loan and grant program can fund up to $2 million per UST facility under RCW 70A.345.030, with applications open through March 1, 2027. The statute lists upgrading or replacing a petroleum UST system among its uses, so ask PLIA whether corrosion work qualifies before budgeting. A rectifier adjustment counts as a repair here, which adds a corrosion expert's specification and two retests to the bill. Each Ecology checklist counts tanks and piping runs, so send the job out for Washington CP quotes with those counts and the last CP survey checklist attached.

Cathodic protection testing in Washington follows WAC 173-360A-0430: a test at installation or repair, another one to six months later, then one every three years. Impressed current sites add corrosion monitoring between tests: the rectifier is checked at least every 60 days against the last test's ranges and logged on checklist ECY 070-340. A zero or out-of-range reading gives the owner 24 hours to notify a corrosion expert or CP tester. Installing or repairing those rectifier systems also falls under chapter 19.28 RCW, the state electrical law, on top of the UST certification. Crews digging toward a suspected leak in Everett or Olympia should say which of the OSHA 40-hour HAZWOPER course options they completed.

Washington contractors for cathodic protection

See all Washington contractors

Frequently Asked Questions

Who decides how a failing Washington CP system gets fixed?

Under WAC 173-360A-0920, a corrosion expert or a CP tester may run the test, while design, failed-system evaluation and repair specifications belong to the corrosion expert. A corrosion expert holds NACE certification, another Ecology-approved credential, or a Washington professional engineer license plus CP tester certification. Owners carry the duty to confirm it. Designing CP for a metal tank is also the corrosion expert's job under WAC 173-360A-0310.

What can a missed CP test cost a Washington tank owner?

RCW 70A.355.070 sets a civil penalty of up to $5,000 per tank per day for violating the state UST law or its rules. That cap is general, not a CP fine. Under WAC 173-360A-0220, fuel may not be delivered to a facility without a valid compliance tag unless Ecology authorizes it in writing, and the tag depends on corrosion protection. Tag eligibility requires compliance with the whole chapter under WAC 173-360A-0220(2), so a missing rectifier log can put it at risk too.

How soon must a Washington CP system be retested after a rectifier adjustment?

Washington's UST definitions in WAC 173-360A-0150 treat a rectifier adjustment, such as a voltage or amperage change or a fuse or diode swap, as a repair. WAC 173-360A-0490 then requires a test at the time of the repair and a second one between one and six months later. A corrosion expert must specify the change first. Release detection work sits on a separate page: tightness and leak testing in Washington.

Who sends the CP checklist to Washington's Department of Ecology, and by when?

The tester completes the checklist after each CP survey, but the owner must get a copy to the Department of Ecology within 30 days of the test date. The CP section of chapter 173-360A WAC sets that window and requires the checklist Ecology provides. Copies can go in electronically through Ecology's TEDS document portal page, which lists both CP evaluation checklists. Keep CP test records for at least six years and rectifier logs for three. Take a copy before the tester leaves.

Which readings pass on Washington's CP evaluation checklists?

Checklist ECY 070-339 offers three pass criteria for a galvanic system: negative 850 millivolts with protection applied, negative 850 millivolts instant off, or 100 millivolts of polarization. The last two work only if the anodes can be disconnected from the structure. Under the STI R051 method, both the local and the remote reading must be more negative than negative 850 millivolts. The remote reference cell sits more than 30 feet from the structure with no metal in between. Rectifier-driven systems use checklist ECY 070-340 instead; the national guide covers how ICCP rectifiers and anode beds work.

For Washington UST regulations, visit the Washington State Department of Ecology. Federal requirements are available from the EPA UST Program.