Cathodic Protection

Cathodic Protection Companies in Mississippi

Compare Mississippi firms for CP surveys, anode and rectifier repair, and MDEQ evaluation forms. Serving Jackson, Gulfport, Biloxi, Hattiesburg and Tupelo.

What to Know About Cathodic Protection in Mississippi

Cathodic protection companies in Mississippi answer to MDEQ, which alone certifies who tests. MDEQ's underground storage tank program regulates corrosion protection, and a CP survey counts only when an MDEQ Certified Cathodic Protection Tester performs it. The tester measures whether anodes or a rectifier still protect buried steel tanks and metal piping, then marks the result pass, fail or inconclusive on MDEQ's form. Section 280.32 of 11 Miss. Admin. Code Pt. 5, Ch. 2 holds those corrosion rules, one section off from the federal numbering. Before buying an older Jackson fuel site, request the latest MDEQ evaluation form and site drawing, and check environmental assessment costs for Mississippi property.

Older steel systems turn up at Jackson convenience stores along I-55, Hattiesburg truck stops and fleet yards around Gulfport and Biloxi on the Gulf Coast. Anode retrofits change who does the job, because MDEQ's CP tester certification does not allow drilling for supplemental anodes; that work needs a licensed installer. MDEQ's list marks CP-only firms with code A. Impressed current systems add a third role, since a corrosion expert must design them, though an MDEQ certified installer may install or repair them. Ask Mississippi UST service companies which of those roles their crew covers.

Mississippi's Groundwater Protection Trust Fund will not pay for CP repairs, because the Trust Fund rules in Pt. 5, Ch. 1 exclude repairing or replacing tank systems. MDEQ tank fees add $150 per tank each year, temporarily idle tanks included. Violations of any MDEQ UST rule, CP rules included, carry civil penalties up to $25,000 per violation per day under the Mississippi Underground Storage Tank Act. Survey price rises with the electrode placements MDEQ wants drawn and read, so tank count, metal piping runs, test stations and soil access over each tank all count. List the survey and any repair separately when you ask Mississippi CP firms to bid.

Cathodic protection testing in Mississippi is recorded on MDEQ's galvanic evaluation form or its impressed current twin, and MDEQ says those forms must be used. Each survey also needs a site drawing of every reference electrode placement, or MDEQ treats it as invalid. Galvanic tanks get a local and a remote reading, and when the two disagree the result is inconclusive: repairs must be made or a corrosion expert evaluates the data. MDEQ's failure notification form lists the CP test and the 60-day rectifier log among its failure types, and crews digging near a suspected release should meet HAZWOPER training requirements. Before booking a survey in Southaven or Tupelo, send the tester the last survey's site drawing so new readings land on the same electrode spots.

Mississippi contractors for cathodic protection

See all Mississippi contractors

Frequently Asked Questions

What does MDEQ require before a tester can run CP surveys?

Mississippi's certified contractor rules in Pt. 5, Ch. 3 grant the certificate once an applicant passes an MDEQ-approved third-party exam. Approved course providers include ALPEC, NACE, PETCON and STI. Applicants also document six months of work under a licensed installer, technician or CP tester. MDEQ charges no certification fee, but the state credential expires when the third-party one does.

Will the Groundwater Protection Trust Fund pay to replace failed anodes?

No, repairs to anodes or rectifiers are the owner's cost. Under the Act's Trust Fund caps, the fund pays up to $1,500,000 per site per confirmed release for cleanup and up to $1,000,000 for third-party judgments. Those dollars reach only owners in substantial compliance, meaning the tank is registered with MDEQ and the owner made a good-faith effort to follow the rules, corrosion protection included. Reimbursement can also shrink by $100 a day for documents sent after an MDEQ deadline.

How long does MDEQ give an owner to fix a failed CP survey?

Ninety days is the standard window. MDEQ's survey form has a Repair and Retest box, which means fixing the system within 90 days and testing again. When the system is otherwise in good working condition, MDEQ's CP evaluation guidelines allow a 90-day retest period first, with no repair needed during it. If the retest also fails, repairs follow within no more than 90 more days. Any other timeframe needs MDEQ approval.

How many 60-day rectifier logs must a Mississippi station keep?

Six, double the federal number. Federal rule 40 CFR 280.31 asks owners of impressed current systems to keep the three latest 60-day rectifier checks, while section 280.32 of Mississippi's UST rule requires the last six. The MDEQ log form also flags any amperage reading that moves 20% or more from the last passing test when no design minimum is listed. A swing that size means calling a qualified person to find out why, not waiting for the next three-year CP survey.

Why won't MDEQ accept an 850 on reading from a rectifier system?

The August 2026 revision of MDEQ's CP guidelines rules out the 850 on criterion for impressed current systems. Testers need instant-off readings, taken with an interrupter or by cycling the rectifier 3 seconds off and 15 on, or 100 mV of polarization within 24 hours. The same guidelines suggest an impressed current evaluation every year, though the rule does not require one. Ask whether the crew brings an interrupter, and see choosing a qualified CP contractor for other questions to put to a firm.

For Mississippi UST regulations, visit the Mississippi Department of Environmental Quality. Federal requirements are available from the EPA UST Program.